Home / Quality
Quality & documentsEvidence before promises
We agree acceptance criteria before production and share the documents that support each line. Copies are provided per project under a confidentiality agreement where needed.
Our quality process
How quality is controlled
Spec sign-off
Drawing, materials, finishes and acceptance criteria agreed in writing.
Sample / first unit
Approved sample or first unit becomes the reference for production.
In-process checks
Factory quality checks during moulding and assembly.
Pre-shipment
Check against the approved sample before loading; third-party inspection on request.
Document pack
Documents for the bathroom line
| Document | Status |
|---|---|
| Quality management documentation for the production line | On request |
| Raw material and product test reports | On request, per project |
| Inspection records against the approved sample | Per shipment |
| Destination-market certification (e.g. CE / UKCA, WaterMark, CSA / IAPMO) | Certification support by market; confirmed before quotation |
Availability depends on product and market. Copies are shared with qualified buyers on request.
Material
Why SMC for bathrooms
- Integrated moulded floor pan: no joints, no leakage path
- Dry construction: no wet work, no construction waste
- Low thermal conductivity: warmer to the touch than tile
- Lightweight, high-strength panels
- Seamless surface, easy to clean
Material test data provided per project on request.

Have a project, drawing or target spec?
Send it to one team. We review it with the right production line and reply with feasibility, sample plan and quotation inputs.